Project overview
An integrated AGV system moving raw materials, work-in-process and finished goods inside the plant.
It supports the customer's three-shift continuous production, runs a stable 20 hours a day, and moves material unmanned over long distances and at high frequency.
WCS cluster scheduling coordinates underride AGVs, unmanned forklifts and palletising equipment as one chain, from raw-material feeding through line transfer and palletising to automatic stacking and put-away.
Implementation highlights
- About 800 raw-material trips plus about 500 cross-line transfers of WIP and finished goods: 1,300 trips a day in total.
- Average trip distance above 600 m, a long-haul inter-building duty. Comparable line-side AGV projects run 100-400 m per trip, so fleet scheduling, path planning and traffic control face far higher demands here.
- About 300 cartons a day reach the palletising station; at 16 cartons a pallet that is roughly 20 pallets, stacked, put away and cycled by unmanned forklift through the 300-pallet buffer.